Old panels (fuse boxes, undersized 60A/100A, or legacy brands like FPE/Federal Pacific and Zinsco) often present safety risks and fail to meet today’s loads. Upgrading to a modern breaker panel with GFCI/AFCI and whole-home surge protection improves safety, capacity, and readiness for EV chargers, heat pumps, dryers, induction ranges, and more.
\n \n \n \n
Signs You Need a Panel Upgrade
\n
\n
Frequent tripping, overheating, burning smell
\n
Fuse box or legacy panels (e.g., FPE/Federal Pacific, Zinsco)
\n
Undersized service (60A/100A) with growing loads (EV, AC, dryer, induction)
Permits/utility coordination (Con Edison/PSEG LI), meter pan/service entrance, new circuits and wall repairs can affect final cost; we provide clear quotes upfront.
\n \n \n
Our Process
\n \n
Free consult → photos of panel & meter → preliminary estimate
\n
Site visit: NEC 220 load calc, grounding/bonding check, material list
\n
Permits & utility coordination as needed
\n
Shutdown, replace, tidy wiring, label circuits
\n
GFCI/AFCI, SPD, grounding and voltage tests
\n
Cleanup, warranty & after-service
\n \n \n \n
Code & Permits
\n
Work is completed to NEC and NYC codes with permits/utility shut-off as required for safe, compliant installations.
\n \n \n
FAQ
\n \n How long does a panel replacement take?\n About 3–6 hours for straightforward swaps; 200A upgrades/permits/new circuits take longer.\n \n \n Do I need 200A?\n Depends on NEC 220 load calculations. EVs, heat pumps, induction ranges often justify 200A.\n \n \n Are GFCI/AFCI and SPDs worth it?\n Yes—better protection for people, wiring and appliances against faults and surges.\n \n \n \n
Areas & Keywords
\n
NYC five boroughs, Long Island (Nassau/Suffolk), Westchester & nearby.
\n
Keywords: electrical panel upgrade NYC, breaker panel replacement, 200A service, subpanel, whole-home surge protection, GFCI/AFCI, grounding, fuse box conversion, EV charger circuit, Con Edison, PSEG Long Island
\n \n \n
Send us photos of your panel & meter for a quick estimate